Previous Projects:
- Structural Engineering
- Civil Engineering
How to Reach Us:
Sage Engineering
1693 S. Coronado Ave.
Boise, ID 83709
Phone: (208) 855-5082
E-mail: brians@sage-eng.com
Structural Engineering Miscellaneous Projects
Showing results 1 - 100 of 246 for the category: Structural – Miscellaneous.
Western Recycling Damaged Wall – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Cool Hand Luke’s – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Wilder Riding Arena – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Toilet Tank Inspection – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Idaho Soccer Center – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Electronic Media Nampa Research – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Whiteman Crane Relocation – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Franklin Place – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Fairlead Beams – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Observatory Renovation – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Eagle River Water Feature Footings – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Mountain Home Intermediate Canopy Remodel – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Envirosafe Retaining Wall – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Joist Inspection – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Eagle Wing Stairs – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Beam Design – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
9633 – Structural
Mr. Smith was the lead engineer in responsible charge for this project
TV Bracket – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Whidbey Island, WA – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Hand Hole Covers
Mr. Smith was the lead engineer in responsible charge for this project
42×60 Pre-Engineered Building Foundation
Mr. Smith was the lead engineer in responsible charge for this project
Steel Beam – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Nyssa Truss Design
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Emmett West Falsework Design
Mr. Smith was the lead engineer in responsible charge for this project
Glenns Ferry Pre-Engineered Building
Mr. Smith was the lead engineer in responsible charge for this project
Rupert Pre-Engineered Building
Mr. Smith was the lead engineer in responsible charge for this project
OWB Medway,MA
Mr. Smith was the lead engineer in responsible charge for this project
Glu-Lam Beam
Mr. Smith was the lead engineer in responsible charge for this project
The Truss
Mr. Smith was the lead engineer in responsible charge for this project
Riverside Village Diversion – Structural
Mr. Smith was the lead engineer in responsible charge for this project
OWB Attleboro,MA
Mr. Smith was the lead engineer in responsible charge for this project
OWB Sagus,MA
Mr. Smith was the lead engineer in responsible charge for this project
Firgrove Mutual Zone 2 Pump Station – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Septic Tank Lid – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Sage
Hayes Shop Lateral – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Recovery Village – Structural
Mr. Smith was the lead engineer in responsible charge for this project
6 Stall Horse Barn – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Marianne Williams Park – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Victory Road Improvements at West J.H. – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Crawford Metalfab Barn – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Lewis and Clark Trail – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Golden West 20403 Signage – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Deer Flat Dam Pipe Formwork – Structural
Mr. Smith was the lead engineer in responsible charge for this project
RSCI Spreader Beams – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Middleton Pressbox Hand Rail – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Miller Bifold Hangar Door Frame – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Devonshire Pool House – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Sali Dock Framing & Piers – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Arnold Garage Due Diligence – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Phantasy Arabian Pole Facilities – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Zimmerman Keystone Wall – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Nagel Beverage Tank Foundation – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Zoo Boise – Generator Pads – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Matthews Wind Tower Footings – Structual
Mr. Smith was the lead engineer in responsible charge for this project
Thompson Pole Barn – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Cherry Lane
Mr. Smith was the lead engineer in responsible charge for this project
Sandstone Reach Road
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Lot 6, Block 1, Tanglerose Retaining Wall – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Statewide
Mr. Smith was the lead engineer in responsible charge for this project
Wood Duck
Mr. Smith was the lead engineer in responsible charge for this project
Milltown
Mr. Smith was the lead engineer in responsible charge for this project
Ash Grove
Mr. Smith was the lead engineer in responsible charge for this project
Cinder Block Door
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Cove East
Mr. Smith was the lead engineer in responsible charge for this project
B&M Beam
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
B.O.C. Gases – Structural
Mr. Smith was the lead engineer in responsible charge for this project
End of Runway Unit – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Metal Building Foundation
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Basketball Hoop
Mr. Smith was the lead engineer in responsible charge for this project
The Gate
Mr. Smith was the lead engineer in responsible charge for this project
Wood Hangar
Mr. Smith was the lead engineer in responsible charge for this project
Washrack
Mr. Smith was the lead engineer in responsible charge for this project
Metal Canopy
Mr. Smith was the lead engineer in responsible charge for this project
Prototype OWB
Mr. Smith was the lead engineer in responsible charge for this project
CBG Framingham Prototype
Mr. Smith was the lead engineer in responsible charge for this project
CBG Revised Prototype #3
Mr. Smith was the lead engineer in responsible charge for this project
Truck Mounted Pile Driver
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Yoshinoya
Mr. Smith was the lead engineer in responsible charge for this project
OWB Prototype Redesign
Mr. Smith was the lead engineer in responsible charge for this project
Aveda South Coast
Mr. Smith was the lead engineer in responsible charge for this project
OWB Smithville, RI
Mr. Smith was the lead engineer in responsible charge for this project
OWB Prototype
Mr. Smith was the lead engineer in responsible charge for this project
Details
Mr. Smith was the lead engineer in responsible charge for this project
Retaining Wall
Mr. Smith was the lead engineer in responsible charge for this project
Awnings
Mr. Smith was the lead engineer in responsible charge for this project
Peachtree
Mr. Smith was the lead engineer in responsible charge for this project
Hara’s Erection
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Animal Shed
Mr. Smith was the lead engineer in responsible charge for this project
Grain Tank
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Cage Lifting Device
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Niels Fugal Sons Trench Shoring – Structural
Mr. Smith was the lead engineer in responsible charge for this project
OWB Billerica
Mr. Smith was the lead engineer in responsible charge for this project
Dahle’s Red-E-Mix Tanks – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Solar Array Foundation – Structural
Mr. Smith was the lead engineer in responsible charge for this project
South Fork Landing Entry Portal – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Cedar Crossing Monument Sign – Strucutural
Mr. Smith was the lead engineer in responsible charge for this project
O.G.&E. Transformer Vaults – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Cole Interchange Soundwalls – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Connolly Bridge Beam – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Cascade Forest Service Bridges – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle