Previous Projects:
- Structural Engineering
- Civil Engineering
How to Reach Us:
Sage Engineering
1693 S. Coronado Ave.
Boise, ID 83709
Phone: (208) 855-5082
E-mail: brians@sage-eng.com
Structural Engineering Bridge Projects
Showing 87 results for the category: Structural – Bridge.
Peppermill Pedestrian Bridge
Bailey Engineering, Inc.
Mr. Smith was the lead engineer in responsible charge for this project
Myers Street Bridge – Structural
Eagle Precast
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Arroyo Pedestrian Bridge- Structural
Arroyo Indio, LLC
Mr. Smith was the lead engineer in responsible charge for this project
Bridge over Black Canyon Canal – Structural
Arriaga Construction, Inc.
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Dry Creek Bridge – Structural
Jayo Construction, Inc.
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Whiteman Manufacturing Bridge Crane Review – Structural
Whiteman Industries
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Cove Creek Bridge – Structural
Eagle Precast
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Wolf Creek Bridge – Structural
Eagle Precast
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Eagle Road Box Girder – Structural
Eagle Precast
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Franklin Road Box Culvert – Structural
Eagle Precast
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Blessinger Road Bridge – Structural
Eagle Precast
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Terry Reilly Pedestrian Bridge
Terry Reilly Health Clinic
Mr. Smith was the lead engineer in responsible charge for this project
Boise Foot Bridge – Structural
Steel Detailers, Inc.
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Sage
Gem County Bridge
Mr. Smith was the lead engineer in responsible charge for this project
Warm Springs Single Tee Bridge & VanAuker Column – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Little Willow Creek Bridge
Mr. Smith was the lead engineer in responsible charge for this project
Peppermill Bridge – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Broadway Bridge – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Eagle Mountain Bike Track Bridge
Mr. Smith was the lead engineer in responsible charge for this project
Black Cat Canal Bridge #2 – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Spurwing Golf Bridge – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Paramount 15 Entrance – Structural
Mr. Smith was the lead engineer in responsible charge for this project
I-84 Acrow Panel Bridge Foundation – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Black Cat Bridge
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
52nd Street Footbridge – Structural
Mr. Smith was the lead engineer in responsible charge for this project
I-84 Acrow Panel Bridge Review – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Notus Bridge
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Midvale Bridge
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Glenwood Bridge
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Trail Creek Single Tee Bridge
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Sun Valley Single Tee Bridge
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Cat Creek Double Tee Bridge
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Forest Service Bridge
Mr. Smith was the lead engineer in responsible charge for this project
ICCO Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Mitchell St. Box Culvert
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Doman Road Bridge Review – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Bartlett Road Bridge
Mr. Smith was the lead engineer in responsible charge for this project
Vineyard Suites Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Klamath Avenue Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Wetland Crossing Bridges – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Willowbrook Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Stiff Leg Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Hilton Boardwalk – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Sedona Pedestrian Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Box Culvert Analysis – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Elijah Bridge Pipe Support – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Fallbrook Meadows Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Rock Creek Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Carrol Creek Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Deep Creek Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Goff Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
CMC Pedestrian Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Salkas Residence Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Far Lateral Canal Bridge Evaluation – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Kenny Meadows Box Culvert – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Salmon River Bridge Evaluation – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Building #3 Foot Bridge – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Wylie Lane Bridge #92 – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Lawrence Young Survey – Civil
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Irma Phillips Re-Zone Legal & Exhibit – Civil
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Bridge Verification for Idaho Power – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Forest Service Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Eagle Road Bridge #241 – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Owyhee Construction Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Indian Creek Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Eckert Road Bridge – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Sand Hollow Creek Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Low-Line Canal Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Flying Y Bridge Deck – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Sage
Tamarack Golf Maint. Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
John Day River Bridge Falsework – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Berg Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Middleton Pedestrian Bridges – Structural
Mr. Smith was the lead engineer in responsible charge for this project
Bandon Dunes Pipe Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
St. Leon & Hitt Rd. Interchange Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
McCall East-West Loop Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Wildwood Street Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Black Canyon & Sand Hollow Bridge Jacking – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Moses Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Shoepeg Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Presley Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Lindsey Canal Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Sedge Creek Bridge Analysis – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Isaac Canyon Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Johnson Creek Park Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Pinnacle
Riverwood Pedestrian Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Sage
Owyhee Bridge – Structural
Mr. Smith was administratively and legally responsible for the management of this project as the principle/founder/owner/president of Sage